Procured through the SCAPE Framework, with gdm being responsible for the full design, planning and construction information, a primary school in Swanscombe required a contemporary design to provide three new classrooms and a new school hall so all the students could come together as one. Working with KCC and the school, gdm designed the new building to complement the existing school but stand out in its own right. The building is positioned on the site in a location where it is easily accessible from the wings of the school, at the heart of the community.